This is a standalone Chrome extension — a self-contained AI app you install directly in Chrome. It doesn't need the BotGentz extension.
Chrome Extension — AI Change Order Description Writer Download the .zip, unzip it, then load it in Chrome via Extensions → Developer Mode → Load unpacked. It starts on a free trial straight away — no login needed to try it. Activation unlocks the full version. Runs on BOT tokens · 100 AI runs per month included.
Download .zip

AI Change Order Description Writer

AI Construction · All
0 installs · Verified BotGentz app
Launch App
Opens in BotSurf — try it free, no account needed.
CategoryAI Construction
PlatformAll
Pricing $19.99/mo
Installs0
Free 7-day trial, no card. Or hold 25,000 BOT instead.
Get BotSurf — free
The browser these apps run in. Free on every platform, no account needed to try an app.

About this app

Describe a change to the project scope, and get it written up as a clean, formal change order description, ready to attach numbers to.

AI Change Order Description Writer is built to be genuinely fast to use: paste or describe what you need, and the response comes back in seconds, not minutes. It opens as a small panel on any page, so agents and site teams can use it from a listing site, an inbox, or a job site laptop without a separate app. It's included in your BotGentz AI subscription, so it's available for every listing, lease, or project update without added per-use cost.

Similar Apps

Log in to BotGentz

Suggest an App

Tell us what you'd find useful — if we build it, we'll email you the moment it's ready.